Mold Problem in Schools - Case Study

Improperly-sized A/C Units Source of Mold Problem in School

PathCon Labs worked with several other firms to help investigate mold growth in a new school. It was determined that extremely high humidity levels were occurring in the school and the problem was traced to improperly sized A/C units. The high humidity resulted in mold growth on walls and other surfaces throughout the school. PathCon Labs developed a plan of remediation and provided for a successful and cost effective solution.